INVESTIGASI NILAI PERMEABILITAS TANAH BERDASARKAN NILAI HASIL CPTU
Abstract: The objective of
this research is to interpret the correlation of CPTu with value of
permeability (k). From the result of CPTu’s data can be evaluated and interpreted
as correlation of value of soil permeability, coefficient of consolidation (ch)
that based on the method on which suggested by Robertson et al (1992b). Profile
interpretation in soil layer was principle performed by Robertson (1986), using
the data value of cone resistance (qc), soil friction along a side sleeve (fs),
and pore water pressure (u2). Those values was firstly calculated to obtain 3
derived units as total cone resistance (qt), friction ratio (FR), pore pressure
parameter (Bq).Value of soil permeability could be estimated from the equation that recommended
by Baligh and Levadox (1986). The result of the test in CPTu-01 area was
performed along the depth 18,44 m from soil surface. Pore water pressure could
be red into 1,4 m, it showed as water surface. while dissipation test was
performed 13,86 m in depth, from soil surface, CPTu-02 was perfomed along the
depth 18,76 m from soil surface. Pore pressure could be red in beginning of the
test, while dissipation test was performed along 10,91 m and 16,75m in depth,
and CPTU-03 was performed along the depth 19,3 m from soil surface
Penulis: Tri Harianto
Kode Jurnal: jptsipildd120160

Artikel Terkait :
Jp Teknik Sipil dd 2012
- PERILAKU LEKATAN TULANGAN POLOS DANTULANGAN ULIR PADASTRUKTUR BETON SERAT KAYU
- FAKTOR-FAKTOR PENENTU PENINGKATAN KINERJA PEJABAT PEMBUAT KOMITMEN (PPK) PADA SATKER APBN DAN SKPD PROVINSI KALIMANTAN TIMUR
- OPTIMALISASI JUMLAH PRODUKSI TIPE RUMAH PADA PROYEK PENGEMBANG PERUMAHAN DENGAN MENGGUNAKAN METODE SIMPLEK (STUDI KASUS : PT.ARAYA BUMI MEGAH MALANG)
- PENGARUH PENAMBAHAN SERBUK BATAMERAH TERHADAP STABILITAS TANAH LEMPUNG SEBAGAI TANAH DASAR JALAN
- PENGARUH KOMPETENSI MANAJER PROYEK TERHADAP KEBERHASILAN PROYEK PADAPERUSAHAAN KONTRAKTOR DI KABUPATEN MALANG
- PENGARUH PENGEKANGAN GFRP TERHADA PKEKUATAN DAN DAKTILITAS KOLOM BETON BERTULANG PERSEGI AKIBAT BEBAN SIKLIK
- PENGARUH KOMPETENSI MANDOR TERHADAP KUALITAS PELAKSANAAN KONTRUKSI GEDUNG DI MALANG RAYA
- PEMAKAIAN FLY-ASH SEBAGAI CEMENTITIOUS PADA BETON MUTU TINGGI DENGAN STEAM CURING (THE USE OF FLY-ASH AS CEMENTITIOUS ON HIGH-STRENGTH CONCRETE WITH STEAM CURING)
- ANALISA TINGKAT BAHAYA EROSI PADA SUB DAS LESTI KABUPATEN MALANG MENGGUNAKAN SISTEM INFORMASI GEOGRAFIS
- ANALISIS SISTEM PENGENDALIAN BIAYA (COST CONTROL FRAMEWORK) PADA PROYEK PELEBARAN JALAN SP.3 LEMPAKE SAMARINDA - SP.3 SAMBERA KALIMANTAN TIMUR
- PENGARUH PERUBAHAN TEGANGAN PRAKONSOLIDASI EFEKTIF (Ó’ C) PADA PENAMBAHAN KAPUR TERHADAP TANAH LEMPUNG
- STUDI PERENCANAAN INSTALASI PENGOLAHAN LIMBAH LINDI SEBAGAI KONTROL PEMENUHAN BAKU MUTU SESUAI KEPMEN 03/91 (STUDI KASUS PADA TPA SUPIT URANG MALANG)
- KORELASI ANTARA VARIASI PEMADATAN TERHADAP NILAI STABILITAS MARSHALL PADA LASBUTAG CAMPURAN PANAS
- ANALISIS CASH FLOW OPTIMAL PADA KONTRAKTOR PROYEK PEMBANGUNAN PERUMAHAN
- ANALISIS OPTIMALISASI WAKTU DAN BIAYA DENGAN PROGRAM PRIMAVERA 6.0 (Studi Kasus : Proyek Perumahan Puri Kelapa Gading)
- PENGENDALIAN WAKTU DAN BIAYA PADA TAHAP PELAKSANAAN PROYEK DENGAN MENGGUNAKAN METODE NILAI HASIL (Studi Kasus : Proyek Lanjutan Pembangunan Gedung PIP2B Kota Manado)
- PERANAN KONSULTAN MANAJEMEN KONSTRUKSI PADA TAHAP PELAKSANAAN MECHANICAL ELECTRICAL – PLUMBING (ME-P) PROYEK PEMBANGUNAN PT. TRAKINDO UTAMA
- ANALISIS DEBIT SUNGAI MUNTE DENGAN METODE MOCK DAN METODE NRECA UNTUK KEBUTUHAN PEMBANGKIT LISTRIK TENAGA AIR
- STUDI PENENTUAN TARIF TOL RENCANA RUAS JALAN MANADO-BITUNG
- PERENCANAAN DAN PENGENDALIAN JADWAL DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2010 (Studi Kasus: Proyek PT. Trakindo Utama)
- EVALUASI KINERJA SIMPANG TIDAK BERSINYAL MENGGUNAKAN PROGRAM aaSIDRA (Studi Kasus: Persimpangan Jalan TNI–Jalan Tikala Ares–Jalan Daan Mogot–Jalan Pomorow, Kota Manado)
- PERBANDINGAN RESPONS STRUKTUR BANGUNAN GEDUNG BERTINGKAT DENGAN DINDING PENGISI DAN TANPA DINDING PENGISI AKIBAT GEMPA
- OPTIMASI JARAK ANTAR DUA BANGUNAN GEDUNG BERTINGKAT YANG BERSEBELAHAN DENGAN MEMPERHITUNGKAN PENGARUH GEMPA
- TINJAUAN PERENCANAAN GEOMETRIK JALAN (STUDI KASUS RUAS JALAN AMIR SYARIFUDDIN KOTA BANDAR LAMPUNG)
- FASILITAS PEJALAN KAKI DAN PESEPEDA