Studi Potensi Pembangkit Listrik Tenaga Mikrohidro (PLTMH) pada PDAM Way Sekampung Kabupaten Pringsewu
Abstract: Electrical energy
has become a part of our lives. Even, for some people has become the primary
requirement that can’t be eliminated. This can affect the sources of energy
used in the process of power generation. Therefore, the presence sources of
renewable energy is needed to increase the energy supply for the community. In
this case, authors tried to do some research to harness the flow of water in
the PDAM Way Sekampung pipe as micro hydro power plant (MHP) The advantage of
making the MHP's pipeline PDAM isn’t need for the manufacture of civilian
buildings by making MHP is only by utilizing the existing water flow in a
pipeline, so the production cost can be reduced. Moreover, can give an idea on
the PDAM and the public that the pipeline PDAM that had been used only as a
water distribution, can be used as power plant. The purpose of this study was
to determine the discharge and head PDAM pipelines and then dimensional turbine
design based on the potential obtained. The survey was conducted to obtain
primary data and secondary data. The primary data is data acquired directly,
while secondary data is the data obtained from documents stored on PDAM Way
Sekampung. From the research, discharge obtained an average of 46.287 L/s in
normal conditions, and have the water level (head) of 5,998 m from the location
of the turbine. The potential of the PDAM Way Sekampung, can generate power of
2,057 Kw. Results dimensional turbine design based on primary data or the
direct retrieval, turbine shaft diameter 20 mm, 239 mm runner diameter, blade
length 212 mm, a thickness of blade 1 mm and blade number 20.
Penulis: Agus Sugiri
Kode Jurnal: jptmesindd140468