Studi Potensi Pembangkit Listrik Tenaga Mikrohidro (PLTMH) pada PDAM Way Sekampung Kabupaten Pringsewu
Abstract: Electrical energy
has become a part of our lives. Even, for some people has become the primary
requirement that can’t be eliminated. This can affect the sources of energy
used in the process of power generation. Therefore, the presence sources of
renewable energy is needed to increase the energy supply for the community. In
this case, authors tried to do some research to harness the flow of water in
the PDAM Way Sekampung pipe as micro hydro power plant (MHP) The advantage of
making the MHP's pipeline PDAM isn’t need for the manufacture of civilian
buildings by making MHP is only by utilizing the existing water flow in a
pipeline, so the production cost can be reduced. Moreover, can give an idea on
the PDAM and the public that the pipeline PDAM that had been used only as a
water distribution, can be used as power plant. The purpose of this study was
to determine the discharge and head PDAM pipelines and then dimensional turbine
design based on the potential obtained. The survey was conducted to obtain
primary data and secondary data. The primary data is data acquired directly,
while secondary data is the data obtained from documents stored on PDAM Way
Sekampung. From the research, discharge obtained an average of 46.287 L/s in
normal conditions, and have the water level (head) of 5,998 m from the location
of the turbine. The potential of the PDAM Way Sekampung, can generate power of
2,057 Kw. Results dimensional turbine design based on primary data or the
direct retrieval, turbine shaft diameter 20 mm, 239 mm runner diameter, blade
length 212 mm, a thickness of blade 1 mm and blade number 20.
Penulis: Agus Sugiri
Kode Jurnal: jptmesindd140468

Artikel Terkait :
Jp Teknik Mesin dd 2014
- RANCANG BANGUN ROBOT KRI 2012
- OPTIMASI MASSA RANGKA KENDARAAN ELEKTRIK PENGANGKUT SAMPAH DENGAN SIMULASI METODE ELEMEN HINGGA
- EVALUASI BESAR BUTIR TERHADAP SIFAT MEKANIS CuZn70/30 SETELAH MENGALAMI DEFORMASI MELALUI CANAI DINGIN
- PERANCANGAN KONSTRUKSI PADA SEGWAY
- STRESS ANALYSIS PADA HORIZONTAL AXIS WIND TURBINE BLADE
- PERANCANGAN SEMI GANTRY CRANE KAPASITAS 10 TON DENGAN BANTUAN SOFTWARE
- PERANCANGAN GANTRY CRANE KAPASITAS 10 TON DENGAN BANTUAN SOFTWARE
- DINAMIKA KENDARAAN JALAN LURUS PADA GEROBAK LISTRIK PENGANGKUT SAMPAH KAPASITAS 2 m3
- EVALUASI DESAIN TERMAL KONDENSOR PLTN TIPE PWR MENGGUNAKAN PROGRAM SHELL AND TUBE HEAT EXCHANGER DESIGN
- PERANCANGAN SISTEM ANGKAT FORKLIFT DENGAN KAPASITAS ANGKAT 7 TON
- ANALISIS PERBANDINGAN KINERJA PERANGKAT BAHAN BAKAR PLTN TIPE PWR AP 1000 DAN PWR 1000 MWe TIPIKAL DENGAN MENGGUNAKAN PROGRAM KOMPUTER
- UJI EKSPERIMENTAL MESIN PENDINGIN BERPENDINGIN AIR DENGAN MENGGUNAKAN REFRIGERAN R22 DAN REFRIGERAN R407C
- SISTEM KONTROL PADA KENDARAAN RODA DUA BERPENGGERAK HIBRIDA
- PENGENDALIAN MODUL PROCESSING BEBASIS SEQUENTIAL FUNCTION CHART (SFC)
- PERANCANGAN PROTOTIPE KENDARAAN LISTRIK BERODA TIGA
- PERANCANGAN COWPER GUNA PEMANFAATAN GAS BUANG PELEBURAN LOGAM
- UJI EKSPERIMENTAL MESIN PENDINGIN BERPENDINGIN UDARA, DENGAN MENGGUNAKAN REFRIGERAN R22 DAN REFRIGERAN R407C
- ANALISIS KINERJA COOLANT PADA RADIATOR
- METODE PENURUNAN RESPON DINAMIK SISTEM POROS-ROTOR DENGAN PEREDAM VISCOUS ROTARY
- PENGENDALIAN MODUL ROTARY HANDLING STATION BEBASIS SEQUENTIAL FUNCTION CHART (SFC)
- PENGARUH KADAR DROMUS OIL DALAM MEDIA PENDINGIN TERHADAP KEKUATAN TARIK DAN STRUKTUR MIKRO BAJA ST 60 YANG MENGALAMI PROSES HARDENING TEMPERING
- METODE PEMBELAJARAN REWINDING MOTOR 1 FASA (POMPA AIR) PADA MATA KULIAH PRAKTEK PEMELIHARAAN MOTOR LISTRIK
- MENINGKATKAN PRESTASI KERJA BANGKU DENGAN PENERAPAN ERGONOMI
- ANALISIS HASIL PENGECORAN LOGAM AL-SI MENGGUNAKAN LUMPUR LAPINDO SEBAGAI PENGIKAT PASIR CETAK
- PENGARUH PEMASANGAN FAN AXIAL DI DALAM INTAKE MANIFOLD DAN VARIASI PUTARAN MESIN TERHADAP UNJUK KERJA DAN EMISI GAS BUANG PADA SEPEDA MOTOR YAMAHA VEGA ZR 11O CC