PENGARUH KOMPETENSI MANAJER PROYEK TERHADAP KEBERHASILAN PROYEK PADAPERUSAHAAN KONTRAKTOR DI KABUPATEN MALANG
ABSTRACT: This study aims to
determine how big a role simultaneously and partially between knowledge, skills
and attitude of the project manager to project success, and to know the most
dominant factorthat affects the success of a project. This research uses survey
research conducted at contractorcompanies in Malang. The population in this
study is the management of the contractor as theproject manager supervisor
leader contractor (director) or authorized by the company. Primary datawas
collected through questionnaires. Secondary data obtained from the literature
to form iteratur,journals, and data from agencies with an interest in this
study, such as professional associations and related agencies.
The results of descriptive analysis using respondents’ answers showed
knowledge variable, variable skills, attitudes and behavior / work commitment,
top management variables on averagehave an important influence to determine the
success of the project. Test results using regression analysis and test assumptions Multiple Linear
Regression analysis shows simultaneously between the variables of knowledge,
skills, work commitment and top management significantly influence the success
of the project amounted to 0.831. Partially between the variables of knowledge,
skills, work commitment and top management significantly influence the success
of the project amounted to 0.286, 0.296, 0.280 and 0.147. Dominant variable
affecting the level of success of a project is a skill / expertise.
Penulis: Khusnul Prianto, Sri
Murni Dewi & Alwafi Pujiraharjo
Kode Jurnal: jptsipildd120302

Artikel Terkait :
Jp Teknik Sipil dd 2012
- PERILAKU LEKATAN TULANGAN POLOS DANTULANGAN ULIR PADASTRUKTUR BETON SERAT KAYU
- FAKTOR-FAKTOR PENENTU PENINGKATAN KINERJA PEJABAT PEMBUAT KOMITMEN (PPK) PADA SATKER APBN DAN SKPD PROVINSI KALIMANTAN TIMUR
- OPTIMALISASI JUMLAH PRODUKSI TIPE RUMAH PADA PROYEK PENGEMBANG PERUMAHAN DENGAN MENGGUNAKAN METODE SIMPLEK (STUDI KASUS : PT.ARAYA BUMI MEGAH MALANG)
- PENGARUH PENAMBAHAN SERBUK BATAMERAH TERHADAP STABILITAS TANAH LEMPUNG SEBAGAI TANAH DASAR JALAN
- PENGARUH PENGEKANGAN GFRP TERHADA PKEKUATAN DAN DAKTILITAS KOLOM BETON BERTULANG PERSEGI AKIBAT BEBAN SIKLIK
- PENGARUH KOMPETENSI MANDOR TERHADAP KUALITAS PELAKSANAAN KONTRUKSI GEDUNG DI MALANG RAYA
- PEMAKAIAN FLY-ASH SEBAGAI CEMENTITIOUS PADA BETON MUTU TINGGI DENGAN STEAM CURING (THE USE OF FLY-ASH AS CEMENTITIOUS ON HIGH-STRENGTH CONCRETE WITH STEAM CURING)
- ANALISA TINGKAT BAHAYA EROSI PADA SUB DAS LESTI KABUPATEN MALANG MENGGUNAKAN SISTEM INFORMASI GEOGRAFIS
- ANALISIS SISTEM PENGENDALIAN BIAYA (COST CONTROL FRAMEWORK) PADA PROYEK PELEBARAN JALAN SP.3 LEMPAKE SAMARINDA - SP.3 SAMBERA KALIMANTAN TIMUR
- PENGARUH PERUBAHAN TEGANGAN PRAKONSOLIDASI EFEKTIF (Ó’ C) PADA PENAMBAHAN KAPUR TERHADAP TANAH LEMPUNG
- STUDI PERENCANAAN INSTALASI PENGOLAHAN LIMBAH LINDI SEBAGAI KONTROL PEMENUHAN BAKU MUTU SESUAI KEPMEN 03/91 (STUDI KASUS PADA TPA SUPIT URANG MALANG)
- KORELASI ANTARA VARIASI PEMADATAN TERHADAP NILAI STABILITAS MARSHALL PADA LASBUTAG CAMPURAN PANAS
- ANALISIS CASH FLOW OPTIMAL PADA KONTRAKTOR PROYEK PEMBANGUNAN PERUMAHAN
- ANALISIS OPTIMALISASI WAKTU DAN BIAYA DENGAN PROGRAM PRIMAVERA 6.0 (Studi Kasus : Proyek Perumahan Puri Kelapa Gading)
- PENGENDALIAN WAKTU DAN BIAYA PADA TAHAP PELAKSANAAN PROYEK DENGAN MENGGUNAKAN METODE NILAI HASIL (Studi Kasus : Proyek Lanjutan Pembangunan Gedung PIP2B Kota Manado)
- PERANAN KONSULTAN MANAJEMEN KONSTRUKSI PADA TAHAP PELAKSANAAN MECHANICAL ELECTRICAL – PLUMBING (ME-P) PROYEK PEMBANGUNAN PT. TRAKINDO UTAMA
- ANALISIS DEBIT SUNGAI MUNTE DENGAN METODE MOCK DAN METODE NRECA UNTUK KEBUTUHAN PEMBANGKIT LISTRIK TENAGA AIR
- STUDI PENENTUAN TARIF TOL RENCANA RUAS JALAN MANADO-BITUNG
- PERENCANAAN DAN PENGENDALIAN JADWAL DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2010 (Studi Kasus: Proyek PT. Trakindo Utama)
- EVALUASI KINERJA SIMPANG TIDAK BERSINYAL MENGGUNAKAN PROGRAM aaSIDRA (Studi Kasus: Persimpangan Jalan TNI–Jalan Tikala Ares–Jalan Daan Mogot–Jalan Pomorow, Kota Manado)
- PERBANDINGAN RESPONS STRUKTUR BANGUNAN GEDUNG BERTINGKAT DENGAN DINDING PENGISI DAN TANPA DINDING PENGISI AKIBAT GEMPA
- OPTIMASI JARAK ANTAR DUA BANGUNAN GEDUNG BERTINGKAT YANG BERSEBELAHAN DENGAN MEMPERHITUNGKAN PENGARUH GEMPA
- TINJAUAN PERENCANAAN GEOMETRIK JALAN (STUDI KASUS RUAS JALAN AMIR SYARIFUDDIN KOTA BANDAR LAMPUNG)
- FASILITAS PEJALAN KAKI DAN PESEPEDA