PENGARUH PERUBAHAN TEGANGAN PRAKONSOLIDASI EFEKTIF (Ó’ C) PADA PENAMBAHAN KAPUR TERHADAP TANAH LEMPUNG
ABSTRACT: Land in the northern
Karangploso a lot of clay and road conditions are not yet paved area slopes
Arjuno especially so with much rain like this to go down to the sub-wheel
motorcycle must be given chain. With the state’s basic research is done, by
mixing soil with lime. Research made by mixing soil and chalk in the four
comparisons. The first native land. Both the original soil mixed with chalk 5%.
The third native soil mixed with chalk 7.5%. The four original soil mixed with
chalk 10%. Each of these sought specific gravity, liquid limit, plastic limit
and plasticity index on the original soil, mixing 5%, 7.5% and 10%. From the
test results, can be summed up as follows: The preconsolidation pressure
original land is 0.66. Mixing soil with chalk, the most optimal to raise the
preconsolidation pressure is mixing 10%. The pressure value Preconsolidation
the mixing of 10% is 2.5.
Penulis: Dandung Novianto,
Supiyono
Kode Jurnal: jptsipildd120296

Artikel Terkait :
Jp Teknik Sipil dd 2012
- PERILAKU LEKATAN TULANGAN POLOS DANTULANGAN ULIR PADASTRUKTUR BETON SERAT KAYU
- FAKTOR-FAKTOR PENENTU PENINGKATAN KINERJA PEJABAT PEMBUAT KOMITMEN (PPK) PADA SATKER APBN DAN SKPD PROVINSI KALIMANTAN TIMUR
- OPTIMALISASI JUMLAH PRODUKSI TIPE RUMAH PADA PROYEK PENGEMBANG PERUMAHAN DENGAN MENGGUNAKAN METODE SIMPLEK (STUDI KASUS : PT.ARAYA BUMI MEGAH MALANG)
- PENGARUH PENAMBAHAN SERBUK BATAMERAH TERHADAP STABILITAS TANAH LEMPUNG SEBAGAI TANAH DASAR JALAN
- PENGARUH KOMPETENSI MANAJER PROYEK TERHADAP KEBERHASILAN PROYEK PADAPERUSAHAAN KONTRAKTOR DI KABUPATEN MALANG
- PENGARUH PENGEKANGAN GFRP TERHADA PKEKUATAN DAN DAKTILITAS KOLOM BETON BERTULANG PERSEGI AKIBAT BEBAN SIKLIK
- PENGARUH KOMPETENSI MANDOR TERHADAP KUALITAS PELAKSANAAN KONTRUKSI GEDUNG DI MALANG RAYA
- PEMAKAIAN FLY-ASH SEBAGAI CEMENTITIOUS PADA BETON MUTU TINGGI DENGAN STEAM CURING (THE USE OF FLY-ASH AS CEMENTITIOUS ON HIGH-STRENGTH CONCRETE WITH STEAM CURING)
- ANALISA TINGKAT BAHAYA EROSI PADA SUB DAS LESTI KABUPATEN MALANG MENGGUNAKAN SISTEM INFORMASI GEOGRAFIS
- ANALISIS SISTEM PENGENDALIAN BIAYA (COST CONTROL FRAMEWORK) PADA PROYEK PELEBARAN JALAN SP.3 LEMPAKE SAMARINDA - SP.3 SAMBERA KALIMANTAN TIMUR
- STUDI PERENCANAAN INSTALASI PENGOLAHAN LIMBAH LINDI SEBAGAI KONTROL PEMENUHAN BAKU MUTU SESUAI KEPMEN 03/91 (STUDI KASUS PADA TPA SUPIT URANG MALANG)
- KORELASI ANTARA VARIASI PEMADATAN TERHADAP NILAI STABILITAS MARSHALL PADA LASBUTAG CAMPURAN PANAS
- ANALISIS CASH FLOW OPTIMAL PADA KONTRAKTOR PROYEK PEMBANGUNAN PERUMAHAN
- ANALISIS OPTIMALISASI WAKTU DAN BIAYA DENGAN PROGRAM PRIMAVERA 6.0 (Studi Kasus : Proyek Perumahan Puri Kelapa Gading)
- PENGENDALIAN WAKTU DAN BIAYA PADA TAHAP PELAKSANAAN PROYEK DENGAN MENGGUNAKAN METODE NILAI HASIL (Studi Kasus : Proyek Lanjutan Pembangunan Gedung PIP2B Kota Manado)
- PERANAN KONSULTAN MANAJEMEN KONSTRUKSI PADA TAHAP PELAKSANAAN MECHANICAL ELECTRICAL – PLUMBING (ME-P) PROYEK PEMBANGUNAN PT. TRAKINDO UTAMA
- ANALISIS DEBIT SUNGAI MUNTE DENGAN METODE MOCK DAN METODE NRECA UNTUK KEBUTUHAN PEMBANGKIT LISTRIK TENAGA AIR
- STUDI PENENTUAN TARIF TOL RENCANA RUAS JALAN MANADO-BITUNG
- PERENCANAAN DAN PENGENDALIAN JADWAL DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2010 (Studi Kasus: Proyek PT. Trakindo Utama)
- EVALUASI KINERJA SIMPANG TIDAK BERSINYAL MENGGUNAKAN PROGRAM aaSIDRA (Studi Kasus: Persimpangan Jalan TNI–Jalan Tikala Ares–Jalan Daan Mogot–Jalan Pomorow, Kota Manado)
- PERBANDINGAN RESPONS STRUKTUR BANGUNAN GEDUNG BERTINGKAT DENGAN DINDING PENGISI DAN TANPA DINDING PENGISI AKIBAT GEMPA
- OPTIMASI JARAK ANTAR DUA BANGUNAN GEDUNG BERTINGKAT YANG BERSEBELAHAN DENGAN MEMPERHITUNGKAN PENGARUH GEMPA
- TINJAUAN PERENCANAAN GEOMETRIK JALAN (STUDI KASUS RUAS JALAN AMIR SYARIFUDDIN KOTA BANDAR LAMPUNG)
- FASILITAS PEJALAN KAKI DAN PESEPEDA