STUDI PERENCANAAN INSTALASI PENGOLAHAN LIMBAH LINDI SEBAGAI KONTROL PEMENUHAN BAKU MUTU SESUAI KEPMEN 03/91 (STUDI KASUS PADA TPA SUPIT URANG MALANG)
ABSTRACT: The processing of
lye waste instalation is a processing lye waste leachate discharged into water
bodies do not pollute the environment .Harm caused leachatecan kill the
organisms – organismsif the leachate is discharged directly into water bodies
without prior treatment.
Need for storage pondsfor leachate treatment plant, and therefore the
capacity to design ponds need to know how the leachate discharges.Required to
discharge leachate storage ponds designedto meet the volume of pond water
leachate.From the analysis of the leachate discharge obtained by9.43 m3/day.
And the production of leachate was 0.8 m3 / day. Levels of waste treatment unit
COD= 8960mg / l and BOD5 = 3968.293 mg / l, after going through the waste
treatment plant to be COD = 298.67 mg / l and BOD5 = 88.18 mg / l. From the
processing of these three levels in an already meets the standard group III
cross section pond 03/91.
Penulis: Chairil Saleh
Kode Jurnal: jptsipildd120295

Artikel Terkait :
Jp Teknik Sipil dd 2012
- PERILAKU LEKATAN TULANGAN POLOS DANTULANGAN ULIR PADASTRUKTUR BETON SERAT KAYU
- FAKTOR-FAKTOR PENENTU PENINGKATAN KINERJA PEJABAT PEMBUAT KOMITMEN (PPK) PADA SATKER APBN DAN SKPD PROVINSI KALIMANTAN TIMUR
- OPTIMALISASI JUMLAH PRODUKSI TIPE RUMAH PADA PROYEK PENGEMBANG PERUMAHAN DENGAN MENGGUNAKAN METODE SIMPLEK (STUDI KASUS : PT.ARAYA BUMI MEGAH MALANG)
- PENGARUH PENAMBAHAN SERBUK BATAMERAH TERHADAP STABILITAS TANAH LEMPUNG SEBAGAI TANAH DASAR JALAN
- PENGARUH KOMPETENSI MANAJER PROYEK TERHADAP KEBERHASILAN PROYEK PADAPERUSAHAAN KONTRAKTOR DI KABUPATEN MALANG
- PENGARUH PENGEKANGAN GFRP TERHADA PKEKUATAN DAN DAKTILITAS KOLOM BETON BERTULANG PERSEGI AKIBAT BEBAN SIKLIK
- PENGARUH KOMPETENSI MANDOR TERHADAP KUALITAS PELAKSANAAN KONTRUKSI GEDUNG DI MALANG RAYA
- PEMAKAIAN FLY-ASH SEBAGAI CEMENTITIOUS PADA BETON MUTU TINGGI DENGAN STEAM CURING (THE USE OF FLY-ASH AS CEMENTITIOUS ON HIGH-STRENGTH CONCRETE WITH STEAM CURING)
- ANALISA TINGKAT BAHAYA EROSI PADA SUB DAS LESTI KABUPATEN MALANG MENGGUNAKAN SISTEM INFORMASI GEOGRAFIS
- ANALISIS SISTEM PENGENDALIAN BIAYA (COST CONTROL FRAMEWORK) PADA PROYEK PELEBARAN JALAN SP.3 LEMPAKE SAMARINDA - SP.3 SAMBERA KALIMANTAN TIMUR
- PENGARUH PERUBAHAN TEGANGAN PRAKONSOLIDASI EFEKTIF (Ó’ C) PADA PENAMBAHAN KAPUR TERHADAP TANAH LEMPUNG
- KORELASI ANTARA VARIASI PEMADATAN TERHADAP NILAI STABILITAS MARSHALL PADA LASBUTAG CAMPURAN PANAS
- ANALISIS CASH FLOW OPTIMAL PADA KONTRAKTOR PROYEK PEMBANGUNAN PERUMAHAN
- ANALISIS OPTIMALISASI WAKTU DAN BIAYA DENGAN PROGRAM PRIMAVERA 6.0 (Studi Kasus : Proyek Perumahan Puri Kelapa Gading)
- PENGENDALIAN WAKTU DAN BIAYA PADA TAHAP PELAKSANAAN PROYEK DENGAN MENGGUNAKAN METODE NILAI HASIL (Studi Kasus : Proyek Lanjutan Pembangunan Gedung PIP2B Kota Manado)
- PERANAN KONSULTAN MANAJEMEN KONSTRUKSI PADA TAHAP PELAKSANAAN MECHANICAL ELECTRICAL – PLUMBING (ME-P) PROYEK PEMBANGUNAN PT. TRAKINDO UTAMA
- ANALISIS DEBIT SUNGAI MUNTE DENGAN METODE MOCK DAN METODE NRECA UNTUK KEBUTUHAN PEMBANGKIT LISTRIK TENAGA AIR
- STUDI PENENTUAN TARIF TOL RENCANA RUAS JALAN MANADO-BITUNG
- PERENCANAAN DAN PENGENDALIAN JADWAL DENGAN MENGGUNAKAN PROGRAM MICROSOFT PROJECT 2010 (Studi Kasus: Proyek PT. Trakindo Utama)
- EVALUASI KINERJA SIMPANG TIDAK BERSINYAL MENGGUNAKAN PROGRAM aaSIDRA (Studi Kasus: Persimpangan Jalan TNI–Jalan Tikala Ares–Jalan Daan Mogot–Jalan Pomorow, Kota Manado)
- PERBANDINGAN RESPONS STRUKTUR BANGUNAN GEDUNG BERTINGKAT DENGAN DINDING PENGISI DAN TANPA DINDING PENGISI AKIBAT GEMPA
- OPTIMASI JARAK ANTAR DUA BANGUNAN GEDUNG BERTINGKAT YANG BERSEBELAHAN DENGAN MEMPERHITUNGKAN PENGARUH GEMPA
- TINJAUAN PERENCANAAN GEOMETRIK JALAN (STUDI KASUS RUAS JALAN AMIR SYARIFUDDIN KOTA BANDAR LAMPUNG)
- FASILITAS PEJALAN KAKI DAN PESEPEDA