ANALISIS PERBANDINGAN RENCANA ANGGARAN BIAYA STRUKTUR PELAT LANTAI KONVENSIONAL DENGAN SISTEM FLOOR DECK
Abstract: This study is
intended for comparison of the structure of a conventional floor slab and floor
deck system. The aim of research looking for an easy job execution, performance
and productivity of labor and equip-ment are high, the effectiveness of a
faster time and low cost of the two methods. Object of research on Building
Project National Craft Council and Scout (DESPRA) Central Java, Semarang. This
comparative study covers the analysis of the implementation of the work, the
analysis of the performance and produc-tivity of labor and equipment, timing
analysis, the cost of implementation with field observation method.
Implementation of research results slab floor deck system more effective and
efficient both from the level of difficulty and time required compared to
conventional floor plate. Labor productivity and higher tool structure floor
deck slab system compared to conventional floor plate structure. While the
performance of slab floor deck system is better than the conventional floor
plate. The timing of the slab floor deck system faster than conventional floor plate
difference of 6.92 days. Costs on the work floor deck slab system less than a
conventional floor plates by a margin of 8.105%
Penulis: Muh Nur Sahid, Budi
Priyanto, Winardi
Kode Jurnal: jptsipildd150753

Artikel Terkait :
Jp Teknik Sipil dd 2015
- PREDIKSI BEBAN SEDIMENTASI WADUK SELOREJO MENGGUNAKAN DEBIT EKSTRAPOLASI DENGAN RANTAI MARKOV
- FAKTOR-FAKTOR YANG MEMPENGARUHI KINERJA MANAJER PROYEK PADA PROYEK KONSTRUKSI
- KORELASI ANTARA TEMPERATUR PEMADATAN PADA CAMPURAN ASPAL BETON HASIL DAUR ULANG TERHADAP STABILITAS MARSHALL
- PENGARUH PEMBERIAN JUMLAH DAN RASIO (L/D) SERAT BENDRAT TERHADAP SIFAT MEKANIK BETON
- EVALUASI RUTE ANGKUTAN KOTA BERBASIS KEBUTUHAN PERGERAKAN MASYARAKAT DENGAN METODE (GIS) DI KOTA MALANG
- PEMAHAMAN SISWA SMA TENTANG ARTI MARKA JALAN DAN PERATURAN LALU LINTAS
- KAJIAN KETERSEDIAAN LAHAN DITINJAU DARI RENCANA STRATEGIS PENGEMBANGAN KAMPUS BERKELANJUTAN (STUDI KASUS DI BEBERAPA LOKASI KAMPUS FKIP UNS)
- PENGARUH PENAMBAHAN SATU LANTAI TINGKAT TERHADAP KEAMANAN PORTAL GEDUNG BETON BERTULANG TIGA LANTAI
- REHABILITASI SALURAN TARUM BARAT TERKAIT TATA RUANG WILAYAH JABODETABEK
- ANALISIS KELAYAKAN TARIF AIR BERDASARKAN PENGEMBALIAN BIAYA PENUH DAN SENSITIVITAS NPV
- PENGARUH KOLOM PASIR TERHADAP KONSOLIDASI TANAH LEMPUNG LUNAK
- PENAMBAHAN ABU JERAMI DAN ABU SEKAM PADI PADA CAMPURAN BATU BATA UNTUK MENINGKATKAN KUALITAS DAN EFISIENSI PRODUKSI BATU BATA INDUSTRI TRADISIONAL
- ANALISIS PONDASI BORED PILE DENGAN PRINSIP PROBABILITAS (STUDY KASUS PROYEK HOTEL QUEST SOLO)
- KINERJA KA SANCAKA KELAS EKSEKUTIF DAN KELAS BISNIS DITINJAU DARI KEPUASAN PENGGUNANYA
- PENGARUH LINGKUNGAN KLIEN DALAM INTEGRASI “SUPPLY CHAIN” PADA PROYEK KONSTRUKSI
- KAJIAN QUANTITY SURVEYOR PADA TAHAP PRE CONTRACT DAN POST CONTRACT STUDY KASUS PROYEK AD-PREMIER OFFICE – JAKARTA
- KARAKTERISTIK SIFAT MEKANIS TANAH LEMPUNG TERHADAP KADAR AIR (KAMPUS UNAND LIMAU MANIS PADANG)
- IDENTIFIKASI DAN ANALISIS KERUSAKAN GARIS PANTAI TANJUNG PASIR DI KABUPATEN TANGERANG, BANTEN
- Analisis Konsolidasi dengan Menggunakan Metode Preloading dan Vertical Drain pada Areal Reklamasi Proyek Pengembangan Pelabuhan Belawan Tahap II
- Perkiraan Distribusi Pergerakan Penumpang di Provinsi Jawa Barat Berdasarkan Asal Tujuan Transportasi Nasional
- Analisis Kinerja Fondasi Kelompok Tiang Bor Gedung Museum Pendidikan Universitas Pendidikan Indonesia
- Rencana Anggaran Biaya Pekerjaan Peningkatan Jalan Seksi II Rancabuaya KM.BD.111+450 – 114+850
- Studi Optimalisasi Saluran Sekunder Reijam Kabupaten Karawang menggunakan Perangkat Lunak HECRAS
- Kajian Perilaku Lentur Perbaikan Balok Beton Bertulang dengan Metode External Prestressing