Analisis Efektivitas Mesin Batching Plant 1 dan Mesin Batching Plant 2 dengan Overall Equipment Effectiveness Pada PT. X
Abstract: Overall Equipment
Effectiveness (OEE) is one of Total Productive Maintenance (TPM) application
program, which aims to determine the effectiveness of a machine. PT. X has 3
machine batching plant where machine 1 and 2 used effectively, from the data
historically known that the machines batching plant 1 having a value greater
namely 1030 minutes compared to the engine batching plant 2 that have value 240
minutes. This research measures the OEE value of two machines Bactching Plant
and then compares the results. The value obtained is 82.71% for machine 1 and
84.83% for machine 2. This research suggests that the performance factor is the
biggest problem in the machine OEE values, because the enterprise systems is
make to order, the recommended action is to maximize the production capacity of
each machine by considering a more accurate production targets in each period.
Penulis: Nia Budi Puspitasari,
Eldinda Sazida Permatasari