Analisis Waiting Time dalam Proses Perakitan MV Switchgear dengan Lean Production
Abstract: PT. Siemens Indonesia
is an industry engaged in the production of Energy Distribution, as Simoprime
World Panel with world market-oriented. The problems that occurred there was
delay time and completion of the scheduled production target. Delay in
completion of the scheduled deadline because of the inefficiency caused by the
flow process in the handling of waste resulting from the assembly. The purpose
of this study was to identify waste and operating conditions that occurred on
the main assembly. Lean Production was used in this research. In lean
production concept, Value Stream Analysis Tool (VALSAT) was used as an
instrument to map the waste that occurred and detailed Mapping Tool to
determine the operating conditions. In identifying waste, the weighting of each
work station waste in the main assembly. Based on the weighting of waste which
made known that the biggest waste of waiting time and for the operating
conditions, 21% non value adding activities from main assembly.
Keywords: lean production,
value stream analysis tool (VALSAT), waste, waiting time, non value adding
Penulis: R. Pitaloka
Naganingrum, Lobes Herdiman
Kode Jurnal: jptindustridd120185

Artikel Terkait :
Jp Teknik Industri dd 2012
- Perancangan Key Performance Indicators (KPI) Menggunakan Metode Performance Prism (Studi Kasus di Batik Putra Bengawan)
- Implementasi Rest Web Service Dengan Menggunakan Json Pada Aplikasi Mobile Enterprise Resource Planning
- PERANCANGAN ULANG ALAT MESIN PEMBUAT ES PUTER BERDASARKAN ASPEK ERGONOMI
- Kajian Biomekanika Untuk Jalan Cepat Terhadap Rancangan Knee Joint Sistem Energy Storing Mekanisme 2 Bar Pada Kaki Prosthetic Endoskeletal Bagi Amputee Transfemoral
- Evaluasi Usabilitas SIKAPTA Jurusan Teknik Industri UNS Menggunakan Hierarchical Task Analysis
- Perancangan Motorcycle Lift dengan Mempertimbangkan Anthropometri Sebagai Alat Bantu Servis Sepeda Motor
- Penentuan Frekuensi Perjalanan Angkutan Umum Batik Solo Trans untuk Mengoptimalkan Jumlah Pendapatan
- Perancangan Sistem Manajemen Perusahaan Pengembang Perumahan CV. ABC
- Pengukuran Kinerja Perbankan Menggunakan Kriteria Malcolm Baldrige National Quality Award (Studi Kasus Pada PT. Bank XYZ)
- Perancangan Keseimbangan Lintasan Produksi untuk Mengurangi Balance Delay dan Meningkatkan Efisiensi Kerja
- Pemilihan Pemasok Drum Pelumas Industri Menggunakan Fuzzy Analytical Hierarchy Process (Studi Kasus: PT. Pertamina Pusat dan Production Unit Gresik)
- Analisa Perilaku Konsumen terhadap Merek Deterjen dengan Markov Chain dan Biplot (Studi Kasus: Sartika Swalayan, Jl. Sukowati, Gemolong - Sragen)
- Penentuan Rute Menuju Unit Gawat Darurat (Studi kasus: Kota Surakarta)
- Designing Timber Tracking Application by Using ASP.Net and Web Service as Instrument of Timber Legality Assurance System
- Identifikasi dan Penyusunan Faktor Kepuasan Pelayanan di UPT Perpustakaan Pusat Universitas Sebelas Maret Berdasarkan Persepsi Pengunjung
- Model Pengukuran Kinerja dengan Menggunakan Metode Integrated Performance Measurement Systems dan Analytical Hierarchy Process
- Identifikasi Kriteria Keberhasilan Proyek
- Review: Teknik Manufaktur Komposit Hijau dan Aplikasinya
- Perancangan Ulang Fasilitas Fisik Kerja Operator di Stasiun Penjilidan pada Industri Percetakan Berdasarkan Prinsip Ergonomi
- Generator Magnet Permanen Sebagai Pembangkit Listrik Putaran Rendah
- Geomorfologi Sungai Klawing Daerah Bobotsari, Kabupaten Purbalinggga, Jawa Tengah
- UNJUK KERJA VOICE OVER INTERNET PROTOCOL PADA JARINGAN LOKAL UNIVERSITAS JENDERAL SOEDIRMAN
- Studi Potensi Minyak Dangkal dengan Pendekatan Metode Statistik Berdasar Data Geologi Permukaan Di Cekungan Banyumas
- Pengaruh Beban Kendaraan sebagai Beban Titik terhadap Deformasi Geogrid sebagai Perkuatan Embankment di atas Tanah Lunak