Deformasi Vertikal Dan Horisontal Pada Tanah Lunak Di Bawah Trial Embankment Di Kendal, Kaliwungu, Semarang
Abstract: Soft soil as
foundation soil always became problems related to constructions those were
constructed on it. The understanding of physical and mechanical properties of
soft soil were important for understanding the behaviour of this soil due to
vertical loading. One of types of vertical loading was trial embankment. The
analysis for vertical and horizontal deformation in soft soil carried out by
comparing between the data resulted from field measurement and from numerical
simulation. Numerical simulation carried out by using Plaxis version 7.0. In
this simulation, soft soil and embankment soil were modelled in Mohr-Coulomb
model material. The results of the analysis showed that there was an
increasement in soft soil shear strength. This condition led to the decreasement
in horizontal deformation. The extreme difference in horizontal deformation
between field measurement and numerical simulaton caused by the difference
assumption used in soil modeling. For instance modulus of elasticity
assumption, soil homogeneity assumption, and fixed condition at the bottom edge
of inclinometer. Maximum vertical deformation in soft soil occurred under the
center of trial embankment. It happened because the highest compression
occurred in this area when the maximum height of embankment reached. This
condition led to highest burden supported by the soil under the center of trial
embankment.
Penulis: Adhe Noor Patria
Kode Jurnal: jptindustridd080092

Artikel Terkait :
Jp Teknik Industri dd 2008
- Pengaruh Pemakaian Bahan Tambah Limbah Plastik Kemasan Air Mineral Terhadap Kuat Tekan Dan Kuat Tarik Belah Beton
- Optimasi Berat Struktur Rangka Batang Pada Jembatan Baja Terhadap Variasi Bentang
- Fase-Fase Tektonik Pembentuk Ruang Mineralisasi Emas Di Daerah Selogiri Wonogiri
- Jarak Parit Irigasi Jalur Untuk Tanaman Palawija Daerah Irigasi Banjarcahyana, Banjarnegara
- Konsep Kehidupan Dalam Ruang Pada Kelenteng Sam Kouw Di Surakarta (Studi Kasus : Kelenteng T’ien Kok Sie, Kelenteng Poo An Kiong Dan Cetiya Ksiti Garbha)
- Studi Pengaruh Stabilisasi Tanah Lempung Lunak Menggunakan Kolom Kapur Terhadap Parameter Kecepatan Penurunan Tanah
- Variasi Komposisi Kerapatan Partikel Dan Jumlah Perekat Terhadap Karakteristik Papan Komposit Limbah Kayu Aren – Serbuk Gergaji
- Penentuan Kapasitas Daya Reaktif Dan Frekuensi Tuning Filter Pasif Untuk Mengurangi Kandungan Arus Harmonik Beban
- Simulasi Penerapan Mikrokontroller At89c51 Dalam Proses Penyortiran Balok Kayu Berdasarkan Kriteria Panjang Dan Ketebalan
- Abu Terbang (Fly Ash) Sebagai Bahan Tambah Untuk Meningkatkan Kuat Tekan Bata Beton (Paving Block)
- Perubahan Iklim Kala Pliosen – Plistosen Daerah Bumiayu Ditinjau Dari Bukti Palinologi
- Implementation of RCM II (Reliability Centered Maintenance) and RPN (Risk Priority Number) in Risk Assessment and Scheduling Maintenance Task at HPB (High Pressure Boiler) Base On JSA (Job Safety Analysis) (Case study at PT. SMART Tbk. Surabaya)
- Enterprise Resource Planning System Implementation in Preventive Maintenance: Case Study in AB Furniture Company
- Perancangan Sistem Pengukuran Performansi PT. Pondok Indah Tower dengan Menggunakan Metode Balanced Score Card
- Perancangan Sistem Informasi Stok Darah Real time di Palang Merah Indonesia (PMI) Surakarta
- Usulan Model Pengukuran Kinerja Rantai Suplai untuk Meminimalkan Keterlambatan pada Pengiriman ONS
- Model Persediaan Just In Time (JIT) Terintegrasi dengan Mengakomodasi Kebijakan Material
- Algoritma Sequential Insertion untuk Memecahkan Vehicle Routing Problem dengan Multiple Trips, Time Window dan Simultaneous Pickup Delivery
- Model Joint Economic Lot Size (JELS) pada Kasus Pemanufaktur-Pembeli dengan Permintaan Probabilistik dan Lead Time Variabel
- Rancangan Perbaikan Proses Produksi dengan Pendekatan Lean Six Sigma di CV. Guntur Malang
- Quality Award Untuk Mengevaluasi Pencapaian Implementasi Manajemen Kualitas Perusahaan (Studi Kasus: Evaluasi Implementasi Six Sigma di Perusahaan X)
- Usulan Perencanaan Sampling Penerimaan Berdasarkan Kecacatan Atribut dengan Metode Mil Std 105E pada Proses Penyamakan Kulit
- Perancangan Sistem Ukuran Overall Equipment Effectiveness untuk Memonitor dan Memperbaiki Efisiensi Proses di Bagian Filling dan Packing
- Usulan Jadwal Perawatan Preventif Mesin HGF di Stasiun Puteran Pabrik Gula