Enterprise Resource Planning System Implementation in Preventive Maintenance: Case Study in AB Furniture Company
Abstract: Many manufacturing
plants still use corrective policies in their plant maintenance practice. Often
it is too late for the managers to react upon their plants performance reports
such as losses due to plant unavailability, performance inefficiency and
dropping rate of quality. Neglect of the preventive maintenance planning is a
great disadvantage in any manufacturing system. If such a system is ever going
to reach perfect one-at-a-time manufacturing, there is no time for failed or
wasted parts or standstill. Therefore, the availability of real time data of
plant equipment and process history to enhance the discovery of opportunities
for manufacturing optimization is imperative. This paper describes the
Enterprise Resource Planning (ERP) system concept in the Preventive Maintenance
(PM) practice, and in other part presents the case of AB Furniture where
ineffective maintenance practices are being carried in one of the components of
Manufacturing and Planning Control. The AB company objective is to maximize all
possible values in their products. Therefore, the company must compete on the
basis of Cost Leadership thereby focusing on elimination of waste, economies of
scale, cost reduction and more returns from an initial invested asset in their
mainstay of their operations. However, their maintenance operations, such as
ineffective spare parts management and ineffective maintenance work orders,
contradict their capabilities to compete on the basis of Cost Leadership thus
pose a strategic threat. Consequently, to counter this threat, this paper
recommends adoption of maintenance practices purported by their pre-installed
ERP system and the adoption of PM philosophy supported by that system. Using
ERP system to measure maintenance practices performance indicator coupled with
Maintenance Work Order Analysis, AB Company will be in better position to
identify on how to optimize their maintenance activities in the future.
Penulis: Indra Cahyadi
Kode Jurnal: jptindustridd080090

Artikel Terkait :
Jp Teknik Industri dd 2008
- Pengaruh Pemakaian Bahan Tambah Limbah Plastik Kemasan Air Mineral Terhadap Kuat Tekan Dan Kuat Tarik Belah Beton
- Optimasi Berat Struktur Rangka Batang Pada Jembatan Baja Terhadap Variasi Bentang
- Fase-Fase Tektonik Pembentuk Ruang Mineralisasi Emas Di Daerah Selogiri Wonogiri
- Jarak Parit Irigasi Jalur Untuk Tanaman Palawija Daerah Irigasi Banjarcahyana, Banjarnegara
- Konsep Kehidupan Dalam Ruang Pada Kelenteng Sam Kouw Di Surakarta (Studi Kasus : Kelenteng T’ien Kok Sie, Kelenteng Poo An Kiong Dan Cetiya Ksiti Garbha)
- Studi Pengaruh Stabilisasi Tanah Lempung Lunak Menggunakan Kolom Kapur Terhadap Parameter Kecepatan Penurunan Tanah
- Variasi Komposisi Kerapatan Partikel Dan Jumlah Perekat Terhadap Karakteristik Papan Komposit Limbah Kayu Aren – Serbuk Gergaji
- Penentuan Kapasitas Daya Reaktif Dan Frekuensi Tuning Filter Pasif Untuk Mengurangi Kandungan Arus Harmonik Beban
- Simulasi Penerapan Mikrokontroller At89c51 Dalam Proses Penyortiran Balok Kayu Berdasarkan Kriteria Panjang Dan Ketebalan
- Abu Terbang (Fly Ash) Sebagai Bahan Tambah Untuk Meningkatkan Kuat Tekan Bata Beton (Paving Block)
- Perubahan Iklim Kala Pliosen – Plistosen Daerah Bumiayu Ditinjau Dari Bukti Palinologi
- Deformasi Vertikal Dan Horisontal Pada Tanah Lunak Di Bawah Trial Embankment Di Kendal, Kaliwungu, Semarang
- Implementation of RCM II (Reliability Centered Maintenance) and RPN (Risk Priority Number) in Risk Assessment and Scheduling Maintenance Task at HPB (High Pressure Boiler) Base On JSA (Job Safety Analysis) (Case study at PT. SMART Tbk. Surabaya)
- Perancangan Sistem Pengukuran Performansi PT. Pondok Indah Tower dengan Menggunakan Metode Balanced Score Card
- Perancangan Sistem Informasi Stok Darah Real time di Palang Merah Indonesia (PMI) Surakarta
- Usulan Model Pengukuran Kinerja Rantai Suplai untuk Meminimalkan Keterlambatan pada Pengiriman ONS
- Model Persediaan Just In Time (JIT) Terintegrasi dengan Mengakomodasi Kebijakan Material
- Algoritma Sequential Insertion untuk Memecahkan Vehicle Routing Problem dengan Multiple Trips, Time Window dan Simultaneous Pickup Delivery
- Model Joint Economic Lot Size (JELS) pada Kasus Pemanufaktur-Pembeli dengan Permintaan Probabilistik dan Lead Time Variabel
- Rancangan Perbaikan Proses Produksi dengan Pendekatan Lean Six Sigma di CV. Guntur Malang
- Quality Award Untuk Mengevaluasi Pencapaian Implementasi Manajemen Kualitas Perusahaan (Studi Kasus: Evaluasi Implementasi Six Sigma di Perusahaan X)
- Usulan Perencanaan Sampling Penerimaan Berdasarkan Kecacatan Atribut dengan Metode Mil Std 105E pada Proses Penyamakan Kulit
- Perancangan Sistem Ukuran Overall Equipment Effectiveness untuk Memonitor dan Memperbaiki Efisiensi Proses di Bagian Filling dan Packing
- Usulan Jadwal Perawatan Preventif Mesin HGF di Stasiun Puteran Pabrik Gula