Identifikasi Waste Pada Proses Produksi Key Set Clarinet Dengan Pendekatan Lean Manufacturing
Abstract: This study discusses
lean manufacturing concept to identify waste in Key Set Clarinet production
process at Yamaha Musical Products Indonesia, Ltd. The lean manufacturing
concept is done intially by big picture mapping, waste assessment model (WAM),
value stream mapping (VSM) and cause and effect diagram respectively. The
results show that the dominant waste is defect (26.04%), motion (19.34%),
inventory (19.22%), and waiting (13.91%).
Penulis: Dana Marsetiya Utama,
Shanty Kusuma Dewi, Veronika Indah Mawarti
Kode Jurnal: jptindustridd160206