KELAYAKAN INVESTASI PEMBANGUNAN CONVENTION CENTER DI KOTA MAKASSAR
Abstract: The research was
conducted to determine: (1) the value of the investment and appropriate
management, (2) get the price of the room rental Convention Center and get a
long time the most optimal cooperation with (3) investors Makassar City
Convention Center construction using collaboration systems Build Operate
Transfer (BOT). The results of this study were (1) Convention Center
construction project requires investment of Rp 58.026 billion. Assuming a rate
of 10% per year, it acquired the investment period of 13 years 9 months.
Convention Center construction project is declared eligible to run. It can be
seen from the value of NPV > 0 is Rp 4.490 billion, the value of IRR exceeds
the expected interest rate is 11.58%, Break Even Point Convention Center rental
business happened in year 8 over 2 months, precisely in 2021, ( 2) the optimal
rental fee for each hour is Rp 6.5 million, (3) time of development cooperation
with the investor Makassar Convention Center using a system of cooperation
Build Operate Transfer (BOT). Based on a DPP, then the values obtained
Discounted Payback Period (DPP) from businesses Convention Center is 13 years
and 9 months faster than the 15-year investment period.
Penulis: Tindra Adi Suprawa
Kode Jurnal: jptindustridd140658

Artikel Terkait :
Jp Teknik Industri dd 2014
- Perancangan Mobil Khusus (L200) untuk Berjualan Steak Berdasarkan Aspek Ergonomi
- Analisis dan Usulan Strategi Pemasaran Produk Kerupuk Bawang (Studi Kasus: Kerupuk Sumur Sari Bawang Bandung)
- Usulan Line Balancing Menggunakan Genetic Algorithm (Studi Kasus di PT Multi Garmenjaya, Bandung)
- Peningkatan Produktivitas Usaha Kecil Menengah (UKM) Sentra Industri Sepatu Wedoro Kabupaten Sidoarjo Jawa Timur Dengan Pendekatan Lean Production
- Analisa Faktor-Faktor yang Mempengaruhi Sikap dan Minat Beli Sepatu Wanita Melalui Online Shopping
- Usulan Pengendalian Persediaan Obat dan Pengaturan Penyusunan Obat di Unit Pelaksana Teknis Layanan Kesehatan Perguruan Tinggi “X”
- Usulan Strategi Pemasaran Berdasarkan Analisis Bauran Pemasaran Terhadap Kesesuaian Produk Bank Syariah Dengan Ajaran Agama Islam (Studi Kasus: Bank Syariah Mandiri – Cabang Ahmad Yani Bandung)
- RANCANG BANGUN ALAT PEMILIN TAMPAR PELEPAH PISANG DESA KADUNGREJO KECAMATAN BAURENO KABUPATEN BOJONEGORO
- ASPEK MUTU PRODUK NATA DE COCO DENGAN PENAMBAHAN SARI BUAH MANGGA
- POTENSI EKSTRAK BUNGA ROSELLA (Hibiscus sabdariffa L.) SEBAGAI PEWARNA DAN PENGAWET ALAMI PADA JELLY JAJANAN ANAK
- PERENCANAAN PRODUKSI UNTUK MEMENUHI PERMINTAAN DENGAN BIAYA YANG OPTIMAL
- PEMBANGUNAN DIGESTER GASBIO GUNA MENANGGULANGI GEJOLAK SOSIAL MASYARAKAT SUKODONO SIDOARJO
- PENGENDALIAN KUALITAS PEMOTONGAN KAIN SATEN PADA PROSES PEMBUATAN TAS DI HOME INDUSTRI X DI KABUPATEN SIDOARJO
- EVALUASI KUALITAS PRODUK SUSU KECAMBAH KACANG HIJAU, KAJIAN DARI UMUR KECAMBAH DAN KONSENTRASI Na-CMC
- ANALISIS KUALITAS PADA PRODUKSI LABELSTOCK KERTAS HVS DI PT “X”
- PERENCANAAN PRODUKTIVITAS KERJA DARI HASIL EVALUASI PRODUKTIVITAS DENGAN METODE FISHBONE DI PERUSAHAAN PERCETAKAN KEMASAN PT.X
- RANCANG BANGUN MESIN PENGADUK ABON LELE UNTUK KELOMPOK TANI UMKM ABON LELE
- ANALISIS PENGENDALIAN KUALITAS LAMINATING BOARD DI PT. TIMUR SELATAN PARE KEDIRI
- RANCANG BANGUN MESIN GRANUL PAKAN IKAN DAN UDANG GUNA MENGATASI KENDALA MANDIRI PAKAN
- Pengembangan Data Warehouse dan Aplikasi Investigasi Kecelakaan Kereta Api (Studi Kasus di PT. Kereta Api Indonesia Daerah Operasi IV)
- Pengembangan Metode Pengukuran Usabilitas Surel Dengan Fuzzy AHP Menurut Dimensi ISO 9421 Part 11
- Penentuan Waktu Standar Pemasangan Sambungan Baru di PDAM Kabupaten Karanganyar
- Penilaian Resiko Musculoskeletal Disorders Pekerja Harian Lepas PDAM Tirta Lawu Karanganyar
- Evaluasi Layout Departemen Produksi PT ABC Menggunakan Analisis Kuantitatif Untuk Meminimasi Ongkos Material Handling