Pemilihan Pemasok Drum Pelumas Industri Menggunakan Fuzzy Analytical Hierarchy Process (Studi Kasus: PT. Pertamina Pusat dan Production Unit Gresik)
Abstract: PT Pertamina
Lubricant unit has the largest lubricants production units that PUG (Production
Unit Gresik). As part of the manufacturing industry often experience problems
on PUG electoral system and assessment of supplier. Inaccuracies in selecting
supplier results the selected supplier failed to deliver an order continually.
One of the solutions of this problem is to improve the supplier selection
system. Therefore, this research aims to develop supplier selection model with
involves the Pertamina Oil Centre and PUG. An earlier stage of the research is
to determine the criteria and subcriteria of the supplier selection obtained
through Questionnaires I. The second stage was composing the hierarchy of the
problem that was found in the company. The third stage was composing
Questionnaires II wich translating AHP scale into triangular fuzzy number. The
fourth stage aggregated appraisement of the whole of the respondents. The fifth
stage calculated the value of the degree of possibility. The final stage
calculated the value of consistency ratio from the opinion of the decision
makers. After criteria and sub criteria of the selection and assessment
suppliers has been developed. Then it used to choice the supplier of industrial
lubricant drum. This research resulted eight criteria selection and assessment
of supplier quality criteria, price, delivery, service, innovation, safety and
working environment, flexibility, organization with a total combined all the
criteria as much as sub criteria 29 sub criteria. The highest weighting is
quality’s criteria (1.00), while the highest one is claims replacement good’s
subcriteria (1.00). The results from supplier assessment indicated that the
supplier Y was the chosen supplier.
Keywords: Suppliers, Selection
Criteria, Group decision Analitycal Hierarchy Process, Fuzzy Triangular Number,
Extent Analysis
Penulis: D. A. Mardhikawarih,
Wakhid Ahmad Jauhari, Cucuk Nur Rosyidi
Kode Jurnal: jptindustridd120189

Artikel Terkait :
Jp Teknik Industri dd 2012
- Perancangan Key Performance Indicators (KPI) Menggunakan Metode Performance Prism (Studi Kasus di Batik Putra Bengawan)
- Implementasi Rest Web Service Dengan Menggunakan Json Pada Aplikasi Mobile Enterprise Resource Planning
- PERANCANGAN ULANG ALAT MESIN PEMBUAT ES PUTER BERDASARKAN ASPEK ERGONOMI
- Kajian Biomekanika Untuk Jalan Cepat Terhadap Rancangan Knee Joint Sistem Energy Storing Mekanisme 2 Bar Pada Kaki Prosthetic Endoskeletal Bagi Amputee Transfemoral
- Evaluasi Usabilitas SIKAPTA Jurusan Teknik Industri UNS Menggunakan Hierarchical Task Analysis
- Perancangan Motorcycle Lift dengan Mempertimbangkan Anthropometri Sebagai Alat Bantu Servis Sepeda Motor
- Penentuan Frekuensi Perjalanan Angkutan Umum Batik Solo Trans untuk Mengoptimalkan Jumlah Pendapatan
- Perancangan Sistem Manajemen Perusahaan Pengembang Perumahan CV. ABC
- Pengukuran Kinerja Perbankan Menggunakan Kriteria Malcolm Baldrige National Quality Award (Studi Kasus Pada PT. Bank XYZ)
- Perancangan Keseimbangan Lintasan Produksi untuk Mengurangi Balance Delay dan Meningkatkan Efisiensi Kerja
- Analisa Perilaku Konsumen terhadap Merek Deterjen dengan Markov Chain dan Biplot (Studi Kasus: Sartika Swalayan, Jl. Sukowati, Gemolong - Sragen)
- Penentuan Rute Menuju Unit Gawat Darurat (Studi kasus: Kota Surakarta)
- Designing Timber Tracking Application by Using ASP.Net and Web Service as Instrument of Timber Legality Assurance System
- Analisis Waiting Time dalam Proses Perakitan MV Switchgear dengan Lean Production
- Identifikasi dan Penyusunan Faktor Kepuasan Pelayanan di UPT Perpustakaan Pusat Universitas Sebelas Maret Berdasarkan Persepsi Pengunjung
- Model Pengukuran Kinerja dengan Menggunakan Metode Integrated Performance Measurement Systems dan Analytical Hierarchy Process
- Identifikasi Kriteria Keberhasilan Proyek
- Review: Teknik Manufaktur Komposit Hijau dan Aplikasinya
- Perancangan Ulang Fasilitas Fisik Kerja Operator di Stasiun Penjilidan pada Industri Percetakan Berdasarkan Prinsip Ergonomi
- Generator Magnet Permanen Sebagai Pembangkit Listrik Putaran Rendah
- Geomorfologi Sungai Klawing Daerah Bobotsari, Kabupaten Purbalinggga, Jawa Tengah
- UNJUK KERJA VOICE OVER INTERNET PROTOCOL PADA JARINGAN LOKAL UNIVERSITAS JENDERAL SOEDIRMAN
- Studi Potensi Minyak Dangkal dengan Pendekatan Metode Statistik Berdasar Data Geologi Permukaan Di Cekungan Banyumas
- Pengaruh Beban Kendaraan sebagai Beban Titik terhadap Deformasi Geogrid sebagai Perkuatan Embankment di atas Tanah Lunak