PENGARUH WAKTU PERENDAMAN TERHADAP UJI KUAT TEKAN PAVING BLOCK MENGGUNAKAN CAMPURAN TANAH, SEMEN DAN ABU SEKAM PADI DENGAN ALAT PEMADAT MODIFIKASI

ABSTRACT: Paving block is made of by mixturing cement portland or other hidrolic material, water, and agregate or without any other material. In this research paving blok will be made by using of soil, cement, and rice husk ash. Besides, soaking of paving block is aimed to improve compressive thepaving block that is suitable with SNI 03-0691 (1996). The samples of soil that is used came fromq ITERA, South Lampung. The making of paving block samples consists of two stages. First, mixture A (10% of cement, 5% of rice husk ash, 85% of silt soil) and mixture B (15% of cement,5% of rice husk ash, 80% of silt soil) and the making of samples in the second stage is to deter-mine the effect of immersion of compressive the paving block in which the samples using is samples with optimum compressive result from making samples in the firsh strage by time variant in 0 day, 7 days, 14 days, 21 days and 28 days and also by doing pre-burning and post-burning. From the experiment result of innovation compressive this paving block includes to the quality class D and absorption of paving block that is made of mixturing soil, cement, and rice husk ash is not appropriate with SNI 03-0691 (1996). The adding of rice husk ash gives a little influence in improving compressive of paving block. The soaking that is done to paving block causing the decrease of compressive till 45,7%. The highes compressive produced by paving block post-burning during immersion 0 day that is 11,70 Mpa.
KEYWORDS: poving block, silt soil, rice husk ash, compressive, soaking
Penulis: Iswan, Lusmeilia Afriani, Hedi Saputra
Kode Jurnal: jptsipildd160707

Artikel Terkait :