Penjadwalan Batch Dinamis Flow Shop Untuk Meminimasi Rata-Rata Keterlambatan Penyelesaian Order (Mean Tardiness) dan Jumlah Scrap Tuang di CV. Kembar Jaya
Abstract: CV. Kembar Jaya is a
metal casting manufacturing company which applies Make to Order (MTO) system.
It,s characteristic of scheduling is dynamic batch on flow shop production
system. This scheduling method has risen the tardiness of order completion and
high level of pouring scrap. To solve this problem, a rescheduling procedure
which able to increase the system’s performance is needed. To increase the
system performance, a development of batch dynamic scheduling algorithm has
been done to minimize the mean tardiness and total pouring scrap. The algorithm
consists of setting molding area initialization and five sub algorithms. Sub
algorithm of sorting order and determinating batch size will sort and breakdown
the order into batches. Sub algorithm of molding area repairing will determine
molding area allocation for batches. To prevent the drop temperature, sub
algorithm of determination pouring time will identify the pouring temperature
for batches. Sub algorithm of batch scheduling will schedule batch to work
station. Then sub algorithm of rescheduling will accommodate the dynamic
environment when order was inserted. Mean tardiness from the scheduling
algorithm application is 7.39 hours or minimize mean tardiness until 65.72 %,
from the current scheduling algorithm. Application of the scheduling algorithm
can reduce total pouring scrap into 0 kg or 100 %.
Penulis: Aisyati,
Yuniaristanto, Anik Septiani
Kode Jurnal: jptindustridd070043

Artikel Terkait :
Jp Teknik Industri dd 2007
- Pengaruh Pemasangan Kapasitor Shunt Terhadap Konsumsi Daya Aktif Instalasi Listrik
- Perancangan Aplikasi Informasi SMS untuk Alumni Unsoed Menggunakan UML (Unified Modeling Language)
- Initial Tuning Sebagai Salah Satu Metode Pengoptimalan New Site Pada Jaringan Seluler Gsm (Studi Kasus Pada Area Kerja Pt. Sinergi Telecom Under Ericsson Network)
- Peningkatan Efesiensi Produksi Electric Arc Furnace Dengan Injeksi Oksigen Untuk Menghemat Biaya Energi Listrik Pada Industri Baja
- Prediksi Penyakit Demam Berdarah Dengue (Dbd) Dan Tifus Menggunakan Jaringan Syaraf Tiruan Perambatan Balik (Back Propagation)
- Perencanaan Sistem Distribusi Dengan Analisa Aliran Daya
- Kajian Unjuk Kerja Metode Hidrograf Satuan Sintetik Untuk Penetapan Banjir Rancangan Pada Das Di Pulau Jawa (Studi Kasus Das Cimanuk Hulu)
- IDENTIFIKASI LOKASI STRATEGIS UNTUK KAWASAN INDUSTRI DI KABUPATEN PURBALINGGA
- PROFIL MUKA AIR DI HULU GROUNDSILL TIPE AMBANG LEBAR DAN OGEE
- PEMBATAS KECEPATAN DATA PADA PC-ROUTER BERBASIS LINUX MENGGUNAKAN DISIPLIN ANTRIAN HIERARCHICAL TOKEN BUCKET (HTB)
- SEPTICTANK PERESAPAN SISTEM KANAL (PERSIKAN) SEBAGAI TEKNOLOGI ALTERNATIF PENGENDALIAN PENCEMARAN KOLIFORM TINJA PADA PEMUKIMAN PADAT
- STUDI PENDAHULUAN GEOLOGI GUA LAWA DI PURBALINGGA, JAWA TENGAH
- PENGARUH PENGGUNAAN VISCOCRETE-10 DAN SERAT BAN BEKAS TERHADAP NILAI SLUMP DAN KUAT TEKAN BETON SERAT
- Pengelolaan Supply Produk Waferstick dengan Mempertimbangkan Kapasitas Produksi dan Persediaan Barang Jadi di PT. Tiga Pilar Sejahtera Food,Tbk
- Peningkatan Pelayanan Jasa dengan Menggunakan Metode Servqual dan Metode Quality Function Deployment (Studi Kasus di Larissa Skin Care and Hair Treatment, Surakarta)
- Pengembangan Model untuk Memprediksi Kontribusi Ekonomi dari Kunjungan Wisatawan
- Perencanaan Pengambilan Sampel Lampu TL Dop 10 W pada Post Quality Inspection dengan Metode Military Standard 105D di PT. General Electric Lighting Indonesia
- Evaluasi Proses Pembelajaran Berdasarkan pada Voice Of Customer (Studi Kasus pada Fakultas X, Universitas Y)
- Analisa Faktor-Faktor yang Mempengaruhi Konsumen dalam Keputusan Pembelian Mobil Toyota di Surakarta
- Perbaikan Proses Bisnis Pasang Baru Telepon Kabel di Wilayah Pemasangan Baru Surakarta dengan Metode Fault Tree Analysis
- Pengembangan Model Persediaan Single Vendor-Single Buyer dengan Lead Time Dapat Dikontrol
- Perancangan Sistem Pendukung Keputusan Pengendalian Persediaan Obat Gawat Darurat Prioritas I di RSUD Dr. Moewardi Surakarta
- Penentuan Rute Dan Jadwal Pengiriman Galon Air Minum Dalam Kemasan (AMDK) Dengan Menggunakan Metode Clark And Wright Saving Heuristic
- Perancangan Sistem Informasi Pemrosesan Order Produk Ortosa Prostesa Di Instalasi Ortotik Prostetik Rumah Sakit Ortopedi Prof.Dr. R. Soeharso Surakarta