Perancangan Motorcycle Lift dengan Mempertimbangkan Anthropometri Sebagai Alat Bantu Servis Sepeda Motor
Abstract: This research is
about the improvement of working posture by implementing a tool design. In the
previous condition at the small workshop, Loh Jinawi, the working postures of
the mechanic’s body when doing motorcycle service was not ergonomics and
potentially caused pain or even injure in afterwards the day. By Nordic Body
Map equipped questionnaire, the exact body parts which were affected by these
working positions were known. On the other hand, there was a REBA method that
used to measure how much risks that borne by the mechanic for these postures.
Considering the condition of the workshop, there was no solution to fix the
problem except using a specifically designed motorcycle lift. We transformed
the problem information from our preliminary study into the design requirements
of the tool. The tool was developed by anthropometry consideration. The final
REBA evaluation showed that the tool could significantly reduce the risks.
Penulis: Rahmaniyah Dwi
Astuti, Ilham Priadythama, Gamma Wisnu Nurcahyo
Kode Jurnal: jptindustridd120194

Artikel Terkait :
Jp Teknik Industri dd 2012
- Perancangan Key Performance Indicators (KPI) Menggunakan Metode Performance Prism (Studi Kasus di Batik Putra Bengawan)
- Implementasi Rest Web Service Dengan Menggunakan Json Pada Aplikasi Mobile Enterprise Resource Planning
- PERANCANGAN ULANG ALAT MESIN PEMBUAT ES PUTER BERDASARKAN ASPEK ERGONOMI
- Kajian Biomekanika Untuk Jalan Cepat Terhadap Rancangan Knee Joint Sistem Energy Storing Mekanisme 2 Bar Pada Kaki Prosthetic Endoskeletal Bagi Amputee Transfemoral
- Evaluasi Usabilitas SIKAPTA Jurusan Teknik Industri UNS Menggunakan Hierarchical Task Analysis
- Penentuan Frekuensi Perjalanan Angkutan Umum Batik Solo Trans untuk Mengoptimalkan Jumlah Pendapatan
- Perancangan Sistem Manajemen Perusahaan Pengembang Perumahan CV. ABC
- Pengukuran Kinerja Perbankan Menggunakan Kriteria Malcolm Baldrige National Quality Award (Studi Kasus Pada PT. Bank XYZ)
- Perancangan Keseimbangan Lintasan Produksi untuk Mengurangi Balance Delay dan Meningkatkan Efisiensi Kerja
- Pemilihan Pemasok Drum Pelumas Industri Menggunakan Fuzzy Analytical Hierarchy Process (Studi Kasus: PT. Pertamina Pusat dan Production Unit Gresik)
- Analisa Perilaku Konsumen terhadap Merek Deterjen dengan Markov Chain dan Biplot (Studi Kasus: Sartika Swalayan, Jl. Sukowati, Gemolong - Sragen)
- Penentuan Rute Menuju Unit Gawat Darurat (Studi kasus: Kota Surakarta)
- Designing Timber Tracking Application by Using ASP.Net and Web Service as Instrument of Timber Legality Assurance System
- Analisis Waiting Time dalam Proses Perakitan MV Switchgear dengan Lean Production
- Identifikasi dan Penyusunan Faktor Kepuasan Pelayanan di UPT Perpustakaan Pusat Universitas Sebelas Maret Berdasarkan Persepsi Pengunjung
- Model Pengukuran Kinerja dengan Menggunakan Metode Integrated Performance Measurement Systems dan Analytical Hierarchy Process
- Identifikasi Kriteria Keberhasilan Proyek
- Review: Teknik Manufaktur Komposit Hijau dan Aplikasinya
- Perancangan Ulang Fasilitas Fisik Kerja Operator di Stasiun Penjilidan pada Industri Percetakan Berdasarkan Prinsip Ergonomi
- Generator Magnet Permanen Sebagai Pembangkit Listrik Putaran Rendah
- Geomorfologi Sungai Klawing Daerah Bobotsari, Kabupaten Purbalinggga, Jawa Tengah
- UNJUK KERJA VOICE OVER INTERNET PROTOCOL PADA JARINGAN LOKAL UNIVERSITAS JENDERAL SOEDIRMAN
- Studi Potensi Minyak Dangkal dengan Pendekatan Metode Statistik Berdasar Data Geologi Permukaan Di Cekungan Banyumas
- Pengaruh Beban Kendaraan sebagai Beban Titik terhadap Deformasi Geogrid sebagai Perkuatan Embankment di atas Tanah Lunak