Perancangan Sistem Informasi Pemrosesan Order Produk Ortosa Prostesa Di Instalasi Ortotik Prostetik Rumah Sakit Ortopedi Prof.Dr. R. Soeharso Surakarta
Abstract: Orthotic and
Prosthetic Instalation of Ortopedic Hospital of production unit in the making
of prosthesis orthosis in Indonesia. So far there is no technician status which
contains finishing time for all orders which are being processed . This
condition causes the delay in order finishing time. Therefore, it needs
information system which can make task allocation model (new order) better.
After system analysis was done to find out the needs of the system, the
information system of the process of prosthesis orthosis product order is
designed. The existing system analysis is carried out by using IDEF0 language
while the setting up plan for the information system proposed is carried out by
using object oriented approach and using UML language.At the database setting
up level by using Relational Database Management System (RDBMS) approach needs
adjustment from object oriented approach to relational approach, then user
interface model are designed later. The next step, program codes were made by
giving attention to use case diagram and interaction diagram . From the setting
up for information system were found out some inputs in the forms of forms for
login, the data of patients, products, raw materials needed, raw materials,
order, and technician data. The output were in the forms of early warning for
order, order reports, the order slips, the letter of order and the acknowledge
receipt of the order. From the validation result to the functions in the application
was found out that the functions tested were valid or worked well.
Keywords: Information System;
Order processing; Object Oriented; UML; IDEF0; Relational Database Management
System
Penulis: Muh. Hisyam, Irwan
Iftadi, Anwar Efendi
Kode Jurnal: jptindustridd070037

Artikel Terkait :
Jp Teknik Industri dd 2007
- Pengaruh Pemasangan Kapasitor Shunt Terhadap Konsumsi Daya Aktif Instalasi Listrik
- Perancangan Aplikasi Informasi SMS untuk Alumni Unsoed Menggunakan UML (Unified Modeling Language)
- Initial Tuning Sebagai Salah Satu Metode Pengoptimalan New Site Pada Jaringan Seluler Gsm (Studi Kasus Pada Area Kerja Pt. Sinergi Telecom Under Ericsson Network)
- Peningkatan Efesiensi Produksi Electric Arc Furnace Dengan Injeksi Oksigen Untuk Menghemat Biaya Energi Listrik Pada Industri Baja
- Prediksi Penyakit Demam Berdarah Dengue (Dbd) Dan Tifus Menggunakan Jaringan Syaraf Tiruan Perambatan Balik (Back Propagation)
- Perencanaan Sistem Distribusi Dengan Analisa Aliran Daya
- Kajian Unjuk Kerja Metode Hidrograf Satuan Sintetik Untuk Penetapan Banjir Rancangan Pada Das Di Pulau Jawa (Studi Kasus Das Cimanuk Hulu)
- IDENTIFIKASI LOKASI STRATEGIS UNTUK KAWASAN INDUSTRI DI KABUPATEN PURBALINGGA
- PROFIL MUKA AIR DI HULU GROUNDSILL TIPE AMBANG LEBAR DAN OGEE
- PEMBATAS KECEPATAN DATA PADA PC-ROUTER BERBASIS LINUX MENGGUNAKAN DISIPLIN ANTRIAN HIERARCHICAL TOKEN BUCKET (HTB)
- SEPTICTANK PERESAPAN SISTEM KANAL (PERSIKAN) SEBAGAI TEKNOLOGI ALTERNATIF PENGENDALIAN PENCEMARAN KOLIFORM TINJA PADA PEMUKIMAN PADAT
- STUDI PENDAHULUAN GEOLOGI GUA LAWA DI PURBALINGGA, JAWA TENGAH
- PENGARUH PENGGUNAAN VISCOCRETE-10 DAN SERAT BAN BEKAS TERHADAP NILAI SLUMP DAN KUAT TEKAN BETON SERAT
- Pengelolaan Supply Produk Waferstick dengan Mempertimbangkan Kapasitas Produksi dan Persediaan Barang Jadi di PT. Tiga Pilar Sejahtera Food,Tbk
- Peningkatan Pelayanan Jasa dengan Menggunakan Metode Servqual dan Metode Quality Function Deployment (Studi Kasus di Larissa Skin Care and Hair Treatment, Surakarta)
- Pengembangan Model untuk Memprediksi Kontribusi Ekonomi dari Kunjungan Wisatawan
- Perencanaan Pengambilan Sampel Lampu TL Dop 10 W pada Post Quality Inspection dengan Metode Military Standard 105D di PT. General Electric Lighting Indonesia
- Evaluasi Proses Pembelajaran Berdasarkan pada Voice Of Customer (Studi Kasus pada Fakultas X, Universitas Y)
- Penjadwalan Batch Dinamis Flow Shop Untuk Meminimasi Rata-Rata Keterlambatan Penyelesaian Order (Mean Tardiness) dan Jumlah Scrap Tuang di CV. Kembar Jaya
- Analisa Faktor-Faktor yang Mempengaruhi Konsumen dalam Keputusan Pembelian Mobil Toyota di Surakarta
- Perbaikan Proses Bisnis Pasang Baru Telepon Kabel di Wilayah Pemasangan Baru Surakarta dengan Metode Fault Tree Analysis
- Pengembangan Model Persediaan Single Vendor-Single Buyer dengan Lead Time Dapat Dikontrol
- Perancangan Sistem Pendukung Keputusan Pengendalian Persediaan Obat Gawat Darurat Prioritas I di RSUD Dr. Moewardi Surakarta
- Penentuan Rute Dan Jadwal Pengiriman Galon Air Minum Dalam Kemasan (AMDK) Dengan Menggunakan Metode Clark And Wright Saving Heuristic