Perancangan Ulang Tata Letak Fasilitas di PT. Dwi Komala dengan Metode Systematic Layout Planning
Abstract: PT. Dwi Komala is
one of middle-scale industries that producing in footwear product. In production
system, waste such as movement waste and excessive transportation, are commonly
found and affect to unmet production target. This waste occurs because the work
station placement does not consider the production process flow and spatial
interconnectedness. One of solutions that can be done to repair the facility
layout is redesigning the layout by considering production process flow and the
relationship between any space in the layout. The layout of facilities in this
company is not made based on the good planning but only adjusting with the
existing space, so that irregular layout results. Meanwhile, the facility
layout not taking into account the production process flow, production
machineries placement and production activity requirement results in larger
material handling cost and it will impact on the high production cost and
production process time. For that reason, this research aims to produce the
proposal of layout design that can minimize the material handling cost (MHC).
In this research, the facility is redesigned using Systematic Layout Planning
(SLP). The SLP procedure consists of three stages: analysis, adjustment and
evaluation. The analysis stage includes material flow analysis, activity
relationship chart (ARC), activity relationship diagram (ARD), area requirement
analysis and available area analysis. The adjustment stage includes planning
the spatial relationship diagram and alternative layout design. In evaluation
stage, the evaluation was done on the alternative layout design. Three proposed
layout which minimizes material handling cost could be resulted by Systematic
Layout Planning (SLP) method. The first proposed layout gives a significant
saving of 11.35% compare to existing layout. The second layout results in
31.17% saving while the last layout gives a saving of 32.44%. Thus, the third
layout proposal was recommended as the selected layout proposal.
Keywords: facility layout,
material handling cost, systematic layout planning (SLP), waste, activity
relationship chart (ARC), activity relationship diagram (ARD)
Penulis: R. Pitaloka
Naganingrum, Wakhid Ahmad Jauhari, Lobes Herdiman
Kode Jurnal: jptindustridd130573

Artikel Terkait :
Jp Teknik Industri dd 2013
- Evaluasi Potensi Bisnis Layanan Antar Jemput Sekolah Dasar Swasta Di Surakarta
- Perancangan Key Performance Indicators Menggunakan Metode Performance Prism (Studi Kasus : PT. Aston System Indonesia)
- Perancangan Alat Bantu Tampah Jemuran Daun Tembakau Rajangan Berdasarkan Anthropometri Pekerja
- Design and Development of Vegetable Seller’s Bike by Using Anthropometry Approach and Quality Function Deployment Method (QFD)
- Sistem Pencarian Katalog Buku Menggunakan Hp Dengan Bahasa Pemprograman Java
- Analisis Dupont Untuk Menentukan Usulan Program Perbaikan Kinerja Pada Perusahaan Pertambangan XYZ
- Perancangan Sistem Informasi Manajemen Tiket Bus Online Berbasis Web (Studi Kasus: Agen PO. Harapan Jaya di Sragen)
- Perancangan Ulang Alat Perajangan Daun Tembakau Untuk Mengurangi Keluhan Pada Pekerja
- Perancangan Sistem Informasi Client-Server Pencarian Tugas Akhir, Riset, dan Buku Berbasis Wireless Aplication Protocol (WAP)
- Prototype of Mobile Reverse Logistic Application for Managing Important Document of Natural Disaster Victims (Case Study : The Eruption of Mount Merapi Disaster)
- Analisis Du Pont untuk Menentukan Usulan pada Perusahaan Distribusi Alat Berat PT. XYZ
- Perancangan Aplikasi Reba Solver Berbasis Sistem Operasi Android V 4.0.3
- Perencanaan Dan Pengendalian Persediaan Spare Part Mesin Di Unit Produksi 1 PT. Petrokimia Gresik Menggunakan Kebijakan Can-Order
- Rancangan Mesin Stirling Memanfaatkan Komponen Mesin Lain Yang Ada Di Pasaran Indonesia Sebagai Pembangkit Listrik
- Perancangan Sistem Pengendali Suhu dan Kelembaban untuk Budidaya Jamur Kuping
- Penentuan Harga Pokok Produksi Kunyit dan Produk Olahan di Klaster Biofarmaka Kabupaten Karanganyar
- Analisis Postur Kerja Anak Sekolah Dasar Saat Menggunakan Komputer: Sebuah Studi Kasus
- Usulan Rancangan Troli Sebagai Alat Bantu Angkut Karung Gabah Dalam Rangka Perbaikan Postur Kerja di Penggilingan Padi (Studi Kasus: Penggilingan Padi di Sragen)
- Perancangan Alat Pengemas Vakum Untuk Produk Olahan Jamur Tiram Dalam Rangka Meningkatkan Nilai Jual Dan Masa Pakai
- Analisis Balok Beton Bertulang Tampang T Yang Diperkuat Dengan Wire Rope Menggunakan Program Response-2000 Dan Metode Pias
- Peningkatan Produktivitas Konstruksi Melalui Pemilihan Metode Konstruksi
- Kuat Tekan Dan Kuat Tarik Belah Sebagai Nilai Estimasi Kekuatan Sisa Pada Beton Serat Kasa Aluminiumakibat Variasi Suhu
- Studi Pendahuluan Perubahan Garis Pantai Selama Zaman Kuarter di Daerah Kroya sampai Binangun Kabupaten Cilacap-Jawa Tengah
- Analisis Probabilitas Kecepatan Angin untuk Pesisir Cilacap dengan Menerapkan Distribusi Weibull dan Rayleigh