PERENCANAAN PENJADWALAN DAN PERSEDIAAN SPAREPART DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) DI PT.X
ABSTRACT: PT.X is a supplier
company that manufactures plastic bottles. Currently PT.X has a production
capacity of 4.3 million bottles per day. The production capacity can be met if
theproduction machine running well and in a reliable state. PT.X not currently
have a machinemaintenance activities are laid out well. This often caused many
damage occurs unscheduled engine which causes the cost of lost opportunity
(opportunity cost) for the manufacture of products and the high costs of
component inventory. The method used in solving the problem in this study is
the use of Reliability Centered Maintenance analysis in determining the policy
of treatment and then seek maintenance intervals based on the minimum cost. The
results obtained are contained 8 components that have critical categories with
each scheduled maintenance policyis age replacement, with this calculation
obtained a saving of approximately 44% on inventory costs and increased
reliability component approximately 42% -64%.
Penulis: Evi Siswanti
Kode Jurnal: jptindustridd160229