Rancangan Perbaikan Proses Produksi dengan Pendekatan Lean Six Sigma di CV. Guntur Malang
Abstract: This research aim to
develop an improvement plan of GTR 2 pump production process at CV. Guntur
Malang by incorporating Lean Six Sigma approach. Following DMAIC steps
(Define-Measure-AnalyseImprove-Control), at Measure stage shows that the most
affecting waste is waiting and defect . Next at Improve stage using 5 W – 1 H
method resulted on improvement plan consist of (a) applying statistical based
quality control system by developing control chart during GTR 2 pump test
process, (b) additional training to operator, review and correct work
instruction, (c) relocate material warehouse from Research and Development area
and material stock pile rearrangement, and (d) applying coolent to material
before drilling process.