IDENTIFIKASI WASTE PADA WHOLE STREAM PERUSAHAAN ROKOK DI PT.X16
ABSTRACT: Identify to be done
by using method of lean manufacturing. This research aimed at identify waste
and formulate effort reduction of waste production process smoke in PT.X. The
data were collected from manufacturer records, study to determine processing
time, as well as interview and quisioners which were distributed to workers in
each department. Big picture mapping and value stream mapping tools (VALSAT)
were then utilised to process the data.Result of from research got that during
once production process can reduce from 152.59 minute become 149.59 time and
minute every order 26 day become 19 day. From result of waste workshop known
that type extravagance of cause the happening of production process time depth
( 3 highest ) is defect, waiting time and excessive transportation, so that
appliance (tool) matching with the extravagance type is mapping filter quality
with successive wight 96,6 : 55,86 : and 23,32.According to the result found
also cause of extravagance for example, to the number of time used for the
activity of inspection between aktifitas so that cause production process time
become Ilama, existence of distance which among tobacco warehouse with process
of perajangan resulting the happening of movement of bolak return worker so
that add production process time become llama. One of the ways to improve it is
by applying pull system (Kanban).
Penulis: Rakhmawati
Kode Jurnal: jppertaniandd110256