PERANCANGAN ULANG TATA LETAK FASILITAS PRODUKSI PABRIK TAHU SRIKANDI JUNOK BANGKALAN
ABSTRACT: Industrial problems
not only in how much investment should be planted, production and marketing
procedures but requires planning production facilities covering the location of
facilities planning and design of facilities. Facility design is important to
get the best layout in the transport of materials so that the production
process takes place quickly. This study aimed to redesign the layout of factory
production facilities from the Srikandi’s Tofu industry at the district of
Bangkalan to be more effective. This design based on the connectivity of
production process flow and the distance of material removal. The method used
in this study is Blocplan method. Best layout results using Blocplan produce
1.00 layout score and 5-6 distance proximity to the exchange boiler room and
the room soaking
Penulis: Muh Faishol, Sri
Hastuti, Millatul Ulya
Kode Jurnal: jppertaniandd130539